[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-638578":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},638578,340,1,"单选题","电梯改造、修理单位应当在验收后（ ）内将相关技术资料和文件移交电梯使用单位。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","10日",false,{"key":16,"text":17,"correct":14},"B","20日",{"key":19,"text":20,"correct":21},"C","30日",true,{"key":23,"text":24,"correct":14},"D","1个月","",{"id":6,"name":27,"category":28,"favorite":29},"D1压力管道巡检维护","特种作业",0]