[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-607511":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":22},607511,308,1,"单选题","井下采区、巷道有突水危险或者可能积水的，应当优先施工安装( )，并保证有足够的排水能力。",[11,15,19],{"key":12,"text":13,"correct":14},"A","报警系统",false,{"key":16,"text":17,"correct":18},"B","防、排水系统",true,{"key":20,"text":21,"correct":14},"C","自动控制系统","",{"id":6,"name":24,"category":25,"favorite":26},"煤矿主要负责人","安全生产",0]