[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-606300":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":27,"analysis":28},606300,306,2,"多选题","掘进工作面必须检查瓦斯和CO₂的地点有()。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","机电设备处",true,{"key":16,"text":17,"correct":14},"B","掘进工作面回风流区域",{"key":19,"text":20,"correct":14},"C","局部通风机前后10m以内区域",{"key":22,"text":23,"correct":14},"D","掘进工作面进风流区域",{"key":25,"text":26,"correct":14},"E","局部通风机开关前后10m以内区域","ABCDE","",{"id":6,"name":30,"category":31,"favorite":32},"煤矿瓦斯检查作业","安全生产",0]