[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-605493":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":22},605493,305,1,"单选题","水环式真空抽采泵停止运转后,要按规定将管路和设备中的()放完。",[11,15,19],{"key":12,"text":13,"correct":14},"A","水",true,{"key":16,"text":17,"correct":18},"B","油",false,{"key":20,"text":21,"correct":18},"C","气","",{"id":6,"name":24,"category":25,"favorite":26},"煤矿瓦斯抽采作业","安全生产",0]