[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-604942":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},604942,304,1,"单选题","防治水工程应当有专门设计,工程竣工后由()负责组织验收。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","生产副矿长",false,{"key":16,"text":17,"correct":14},"B","安全副矿长",{"key":19,"text":20,"correct":14},"C","矿长",{"key":22,"text":23,"correct":24},"D","矿井总工程师",true,"",{"id":6,"name":27,"category":28,"favorite":29},"煤矿探放水作业","安全生产",0]