[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-604866":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},604866,304,1,"单选题","更换钻头重新下入钻具时,应()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","慢慢下至距孔底1至2m,先开泵至孔口返水再开钻",true,{"key":16,"text":17,"correct":18},"B","慢慢下至孔底,先开钻再开泵",false,{"key":20,"text":21,"correct":18},"C","慢慢下至距孔底1至2m,同时开启钻机和水泵",{"key":23,"text":24,"correct":18},"D","慢慢下至孔底,先开泵再开钻","",{"id":6,"name":27,"category":28,"favorite":29},"煤矿探放水作业","安全生产",0]