[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-604150":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},604150,302,3,"判断题","通电后爆破不响时,可先将母线取下扭结成短路,使用瞬发电雷管时,至少再等5min方可进入工作面检查。()",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"",{"id":6,"name":21,"category":22,"favorite":23},"煤矿井下爆破作业","安全生产",0]