[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-604023":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},604023,302,2,"多选题","下列不正确的连线操作是()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","脚线连接后留有须头",true,{"key":16,"text":17,"correct":14},"B","班组长连接母线和脚线",{"key":19,"text":20,"correct":14},"C","两脚线接头位置不错开",{"key":22,"text":23,"correct":24},"D","连线前撤人",false,"ABC","",{"id":6,"name":28,"category":29,"favorite":30},"煤矿井下爆破作业","安全生产",0]