[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-603315":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},603315,301,1,"单选题","石门揭煤工作面采用水力冲孔防突措施时,钻孔应至少控制自揭煤巷道至轮廓线外3~5m的煤层,冲孔顺序为()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","先冲边上孔再冲对角孔,最后冲中间孔",false,{"key":16,"text":17,"correct":18},"B","先冲对角孔再冲边上孔,最后冲中间孔",true,{"key":20,"text":21,"correct":14},"C","先冲中间孔再冲边上孔,最后冲对角孔",{"key":23,"text":24,"correct":14},"D","先冲对角孔再冲中间孔,最后冲边上孔","",{"id":6,"name":27,"category":28,"favorite":29},"煤矿防突作业","安全生产",0]