[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-602749":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":22},602749,300,1,"单选题","在连续采煤机掘进巷道时,采煤机调整到位后,开始向正前方煤壁切割,直至截入一定深度才停止,这一工序称为()。",[11,15,18],{"key":12,"text":13,"correct":14},"A","掘进工序",false,{"key":16,"text":17,"correct":14},"B","采垛工序",{"key":19,"text":20,"correct":21},"C","切槽工序",true,"",{"id":6,"name":24,"category":25,"favorite":26},"煤矿采煤机操作作业","安全生产",0]