[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-592547":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":24,"analysis":25},592547,293,2,"多选题","对于坚硬顶板大面积悬顶，有大冒顶危险时，要采取的措施有( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","采取顶板高压注水措施",true,{"key":16,"text":17,"correct":14},"B","从工作面两巷向顶板打深孔进行高压注水",{"key":19,"text":20,"correct":14},"C","用爆破的方法人为地将不能自然冒落的坚硬顶板切断、垮落，垮落后形成碎石垫层",{"key":22,"text":23,"correct":14},"D","严格控制工作面的采高","ABCD","",{"id":6,"name":27,"category":28,"favorite":29},"采煤班组长","安全生产",0]