[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-592297":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":22},592297,293,1,"单选题","采煤工作面支架结构与支护密度对控顶( )影响。",[11,15,18],{"key":12,"text":13,"correct":14},"A","无任何",false,{"key":16,"text":17,"correct":14},"B","有间接",{"key":19,"text":20,"correct":21},"C","有直接",true,"",{"id":6,"name":24,"category":25,"favorite":26},"采煤班组长","安全生产",0]