[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-592234":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},592234,293,1,"单选题","通电后若没有起爆，爆破工须取下爆破手把，将母线摘下，并扭结短路，延期电雷管至少等( )分钟后，方可沿线检查。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","5",false,{"key":16,"text":17,"correct":14},"B","10",{"key":19,"text":20,"correct":21},"C","15",true,{"key":23,"text":24,"correct":14},"D","20","",{"id":6,"name":27,"category":28,"favorite":29},"采煤班组长","安全生产",0]