[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-592191":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},592191,293,1,"单选题","综采工作面主要用( )处理采空区。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","充填法",false,{"key":16,"text":17,"correct":14},"B","放顶封闭法",{"key":19,"text":20,"correct":21},"C","垮落法",true,{"key":23,"text":24,"correct":14},"D","煤柱法","",{"id":6,"name":27,"category":28,"favorite":29},"采煤班组长","安全生产",0]