[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-589706":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":24,"analysis":25},589706,291,2,"多选题","《山西省煤矿建设施工管理标准》要求( )的项目，施工单位必须具有相应的煤矿施工业绩，同时具有国家一级及以上施工资质。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","高瓦斯矿井",true,{"key":16,"text":17,"correct":14},"B","煤（岩）与瓦斯（二氧化碳）突出矿井",{"key":19,"text":20,"correct":14},"C","水文地质条件复杂及以上的矿井",{"key":22,"text":23,"correct":14},"D","立井井深大于600m、斜井长度大于1000m或垂深大于200m","ABCD","",{"id":6,"name":27,"category":28,"favorite":29},"煤矿井下安管员","安全生产",0]