[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-589537":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},589537,291,2,"多选题","承压含水层不具备疏水降压条件时，必须采取( )等防水措施。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","确定探水线",false,{"key":16,"text":17,"correct":18},"B","建筑防水闸门",true,{"key":20,"text":21,"correct":18},"C","留设防水煤柱",{"key":23,"text":24,"correct":18},"D","增加抗灾强排能力","BCD","",{"id":6,"name":28,"category":29,"favorite":30},"煤矿井下安管员","安全生产",0]