[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-589264":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},589264,291,1,"单选题","《山西省煤矿管理标准》要求煤矿建设项目投产后( )内不得申请改扩建。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","三年",false,{"key":16,"text":17,"correct":14},"B","四年",{"key":19,"text":20,"correct":21},"C","五年",true,{"key":23,"text":24,"correct":14},"D","六年","",{"id":6,"name":27,"category":28,"favorite":29},"煤矿井下安管员","安全生产",0]