[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-588838":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":22},588838,291,1,"单选题","立井提升速度超过( )m\u002Fs的提升绞车必须装设限速装置。",[11,15,18],{"key":12,"text":13,"correct":14},"A","2",false,{"key":16,"text":17,"correct":14},"B","2.5",{"key":19,"text":20,"correct":21},"C","3",true,"",{"id":6,"name":24,"category":25,"favorite":26},"煤矿井下安管员","安全生产",0]