[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-587747":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":22},587747,290,1,"单选题","开采冲击地压煤层时,停产()天及以上的采煤工作面,恢复生产的前一班内,应鉴定冲击地压危险程度,并采取相应的安全措施。",[11,15,18],{"key":12,"text":13,"correct":14},"A","2",false,{"key":16,"text":17,"correct":14},"B","1",{"key":19,"text":20,"correct":21},"C","3",true,"",{"id":6,"name":24,"category":25,"favorite":26},"开采爆破安全管理人员","安全生产",0]