[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-582602":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":22},582602,285,1,"单选题","建设项目完工后,需要进行试运行的,其配套建设的职业病防护设施必须与主体工程同时投入试运行。除国家有关部门另有规定或者特殊要求的行业外,以下试运行时间不合理的有()",[11,15,18],{"key":12,"text":13,"correct":14},"A","180日",false,{"key":16,"text":17,"correct":14},"B","30日",{"key":19,"text":20,"correct":21},"C","15日",true,"",{"id":6,"name":24,"category":25,"favorite":26},"安全生产监管证","安全生产",0]