[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-573775":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},573775,270,3,"判断题","起重机龙门钩挂重铁水罐时,应有专人检查是否挂牢,待核实后发出指令,吊车才能起吊;吊起的铁水罐在等待往转炉兑铁水期间,不应提前挂上倾翻铁水罐的小钩。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"",{"id":6,"name":21,"category":22,"favorite":23},"金属冶炼-炼钢","安全生产",0]