[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-572962":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":22},572962,270,1,"单选题","浇铸过程中,结晶器出现断水情况,而安全水塔的事故水又因故未下来,应()。",[11,15,18],{"key":12,"text":13,"correct":14},"A","立即联系水处理,重新供水",false,{"key":16,"text":17,"correct":14},"B","查找事故水未下原因,及时组织供水",{"key":19,"text":20,"correct":21},"C","无条件停浇",true,"",{"id":6,"name":24,"category":25,"favorite":26},"金属冶炼-炼钢","安全生产",0]