[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-571362":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":22},571362,268,1,"单选题","冶金炉窑检修时,凡需拆除的容器、设备和管道,应先()方可进行拆除作业。",[11,15,18],{"key":12,"text":13,"correct":14},"A","制定拆除计划或方案",false,{"key":16,"text":17,"correct":14},"B","对危险、有害因素识别",{"key":19,"text":20,"correct":21},"C","清洗干净,分析、验收合格后",true,"",{"id":6,"name":24,"category":25,"favorite":26},"金属冶炼(铜冶炼)","安全生产",0]