[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-570356":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":22},570356,267,1,"单选题","某铜冶炼企业,为了进一步扩大生产产能,准备投资建设一个年产20万吨铜产能的铜冶炼厂,主要采用闪速炼铜工艺,包括熔炼、制酸、电解等生产工序,主要产品为阴极铜、工业硫酸等。项目委托某设计公司设计、某建设公司实施项目建设,预计三年内完成项目建设。由于近期铜市场较好,为了赶项目进度,该冶炼厂主要负责人决定采取同时设计同时施工的方式加快项目建设进度;同时,考虑到建设成本问题对安全设施的投入进行缩减。项目提前一年建成投产,经试运行、正式投产一直保持了安全无事故。请根据上述场景回答下列问题。该建设项目违反了哪项制度()。",[11,15,19],{"key":12,"text":13,"correct":14},"A","环境影响评价制度",false,{"key":16,"text":17,"correct":18},"B","新建、改建、扩建工程项目的安全设施“三同时”制度",true,{"key":20,"text":21,"correct":14},"C","安全设施施工制度","",{"id":6,"name":24,"category":25,"favorite":26},"金属冶炼(铜及铜合金制造与铸造)","安全生产",0]