[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-563292":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":22},563292,259,1,"单选题","分期开采采用陡帮扩帮作业时,每隔60~90m高度,应布置一个宽度不小于()m的承接滚石平台。",[11,15,18],{"key":12,"text":13,"correct":14},"A","18",false,{"key":16,"text":17,"correct":14},"B","15",{"key":19,"text":20,"correct":21},"C","20",true,"",{"id":6,"name":24,"category":25,"favorite":26},"金属非金属-露天矿山","安全生产",0]