[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-562339":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},562339,258,3,"判断题","采矿方法设计应包括矿房和矿柱回采,地压管理,空区处理可以不考虑。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"",{"id":6,"name":21,"category":22,"favorite":23},"金属非金属-地下矿山","安全生产",0]