[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-562176":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":22},562176,258,1,"单选题","新建、改建、扩建建设项目安全设施的“三同时”工作应在建设项目()进行。",[11,15,18],{"key":12,"text":13,"correct":14},"A","施工开始前",false,{"key":16,"text":17,"correct":14},"B","正式投产后",{"key":19,"text":20,"correct":21},"C","正式投产前",true,"",{"id":6,"name":24,"category":25,"favorite":26},"金属非金属-地下矿山","安全生产",0]