[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-562104":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":22},562104,258,1,"单选题","采用壁式崩落法回采时,回采完毕采用机械撤柱或人工撤柱时,正确的顺序是()。",[11,15,19],{"key":12,"text":13,"correct":14},"A","自下而上、由远而近进行",true,{"key":16,"text":17,"correct":18},"B","自上而下、由远而近进行",false,{"key":20,"text":21,"correct":18},"C","撤柱顺序不限","",{"id":6,"name":24,"category":25,"favorite":26},"金属非金属-地下矿山","安全生产",0]