[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-462496":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},462496,254,2,"多选题","位于兰州的甲(卖方)工厂与位于西安的乙(买方)公司之间签订一买卖合同，约定甲于5月10日通过铁路交货。以下不属于该合同免责事由的有（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","甲的生产设备出现故障，致使不能按时交货",true,{"key":16,"text":17,"correct":14},"B","丙地发生地震，致使甲的原料供应出现困难",{"key":19,"text":20,"correct":14},"C","因甲的产品供不应求，厂方发布文件要求产品只供应甘肃省内客户的需要",{"key":22,"text":23,"correct":24},"D","兰州至西安的铁路线被山洪冲毁，致使甲不能按时交货",false,"ABC","《合同法》第一百一十七条规定，因不可抗力不能履行合同的，根据不可抗力的影响，全部或部分免除责任。当事人延迟履行后发生不可抗力的，不能免除责任。A、B、C项中甲均不能免责，D项因不可抗力导致合同不能履行，甲方可以免责。故选ABC。",{"id":6,"name":28,"category":29,"favorite":30},"公共基础知识","公务员",4]