[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-530005":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},530005,237,1,"单选题","某项目甲乙双方签订了建设合同，其中对工程款支付及知识产权的描述分别是“……甲乙在系统安装完毕，经试运行及初验合格后，收到乙方材料的XX日内，支付第二笔款XXXX元。乙方提供的材料包括：①商业发票；②……”，从上述描述可看出，支付第二笔款还必须附加的材料是（ ）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","第三方测试报告",false,{"key":16,"text":17,"correct":18},"B","初验报告",true,{"key":20,"text":21,"correct":14},"C","专家评审报告",{"key":23,"text":24,"correct":14},"D","监理工作总结报告","",{"id":6,"name":27,"category":28,"favorite":29},"图书专业 (军队文职)","公务员",0]