[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-529775":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},529775,237,1,"单选题","信息系统项目最大的不确定性存在于项目生命周期的（ ）阶段",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","概念",true,{"key":16,"text":17,"correct":18},"B","计划编制",false,{"key":20,"text":21,"correct":18},"C","执行",{"key":23,"text":24,"correct":18},"D","收尾","",{"id":6,"name":27,"category":28,"favorite":29},"图书专业 (军队文职)","公务员",0]