[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-529696":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},529696,237,1,"单选题","项目变更贯穿整个项目过程的始终，项目经理让项目干系人（特别是业主）认识到（ ）",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","在项目策划阶段，变更成本较高",false,{"key":16,"text":17,"correct":14},"B","在项目执行阶段，变更成本较低",{"key":19,"text":20,"correct":21},"C","在项目编码开始前，变更成本较低",true,{"key":23,"text":24,"correct":14},"D","在项目策划阶段，变更成本较低","",{"id":6,"name":27,"category":28,"favorite":29},"图书专业 (军队文职)","公务员",0]