[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-529656":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},529656,237,1,"单选题","成本预算更新通常在（ ）时候进行。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目经理知道如果不修订预算则会导致成本超支",false,{"key":16,"text":17,"correct":18},"B","范围变更得到批准",true,{"key":20,"text":21,"correct":14},"C","项目的任何一个方面重新制订了基准计划",{"key":23,"text":24,"correct":14},"D","应急或管理储备被动用","",{"id":6,"name":27,"category":28,"favorite":29},"图书专业 (军队文职)","公务员",0]