[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-529513":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},529513,237,1,"单选题","为保证项目质量，要对项目进行质量管理，项目质量管理过程的第一步是（ ）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","制定项目质量计划",false,{"key":16,"text":17,"correct":18},"B","确立质量标准体系",true,{"key":20,"text":21,"correct":14},"C","对项目实施质量监控",{"key":23,"text":24,"correct":14},"D","将实际与标准对照","",{"id":6,"name":27,"category":28,"favorite":29},"图书专业 (军队文职)","公务员",0]