[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-230-26":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":623},{"id":5,"name":6,"category":7,"favorite":8},230,"审计学 (军队文职)","公务员",0,26,50,2279,[13,34,46,57,69,81,93,105,117,129,141,153,165,177,189,201,213,225,237,249,261,273,288,300,312,324,336,348,360,372,384,396,408,417,431,443,455,464,475,487,499,513,525,536,550,562,574,588,599,611],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},515300,1,"单选题","投资体制中的三制不包括（）",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","招投标制",false,{"key":24,"text":25,"correct":26},"B","法人制",true,{"key":28,"text":29,"correct":22},"C","合同制",{"key":31,"text":32,"correct":22},"D","监理制","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},515301,"施工许可证的申请者是（）",[38,40,42,44],{"key":20,"text":39,"correct":26},"建设单位",{"key":24,"text":41,"correct":22},"施工单位",{"key":28,"text":43,"correct":22},"设计单位",{"key":31,"text":45,"correct":22},"审计机关",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},515302,"在基础施工中发现地下障碍物，需对原工程设计进行变更，变更导致合同价款的增减及造成的承包商损失应由（）承担。",[50,51,53,55],{"key":20,"text":39,"correct":26},{"key":24,"text":52,"correct":22},"建设单位与承包商共担",{"key":28,"text":54,"correct":22},"承包商",{"key":31,"text":56,"correct":22},"勘察设计单位",{"id":58,"libraryId":5,"type":15,"typeLabel":16,"stem":59,"options":60,"answer":24,"analysis":33},515303,"被审计单位的（）对本单位提供的财务会计资料的真实性和完整性负责。",[61,63,65,67],{"key":20,"text":62,"correct":22},"主要负责人",{"key":24,"text":64,"correct":26},"负责人",{"key":28,"text":66,"correct":22},"财务部门的负责人",{"key":31,"text":68,"correct":22},"财务人员",{"id":70,"libraryId":5,"type":15,"typeLabel":16,"stem":71,"options":72,"answer":31,"analysis":33},515304,"设计一般包括初步设计、技术设计和（）三个主要阶段。",[73,75,77,79],{"key":20,"text":74,"correct":22},"建筑设计",{"key":24,"text":76,"correct":22},"结构设计",{"key":28,"text":78,"correct":22},"适用设计",{"key":31,"text":80,"correct":26},"施工图设计工程",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":24,"analysis":33},515305,"建筑工程概、预算一般是以（）为单位编制的",[85,87,89,91],{"key":20,"text":86,"correct":22},"单项工程",{"key":24,"text":88,"correct":26},"单位工程",{"key":28,"text":90,"correct":22},"分项工程",{"key":31,"text":92,"correct":22},"分部工程",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":24,"analysis":33},515306,"对格式合同条款有两种以上解释的，应当作出（）。",[97,99,101,103],{"key":20,"text":98,"correct":22},"按照通常理解予以解释",{"key":24,"text":100,"correct":26},"不利于提供格式条款一方的解释",{"key":28,"text":102,"correct":22},"该条款无效",{"key":31,"text":104,"correct":22},"有利于提供格式条款一方的解释",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":31,"analysis":33},515307,"下列哪个选项可以不招标（）",[109,111,113,115],{"key":20,"text":110,"correct":22},"大型基础设施，关系社会公众利益的项目",{"key":24,"text":112,"correct":22},"全部或部分使用国有资金投资或国家融资的项目",{"key":28,"text":114,"correct":22},"使用国际组织或者外国政府贷款，援助资金的项目",{"key":31,"text":116,"correct":26},"抢险救灾，国防科研保密性工程",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":24,"analysis":33},515308,"进口设备购置的到岸价格由离岸价格，海运费和（）",[121,123,125,127],{"key":20,"text":122,"correct":22},"关税",{"key":24,"text":124,"correct":26},"海运保险费",{"key":28,"text":126,"correct":22},"外贸手续费",{"key":31,"text":128,"correct":22},"银行手续费",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":24,"analysis":33},515309,"具有决标权的是（）",[133,135,137,139],{"key":20,"text":134,"correct":22},"监理单位",{"key":24,"text":136,"correct":26},"业主",{"key":28,"text":138,"correct":22},"主管部门",{"key":31,"text":140,"correct":22},"投标管理部门",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":28,"analysis":33},515310,"建设单位为了完成基建计划，按规定借入的有偿性基本建设投资，主要包括由国家预算安排的投资借款，向银行或其他金融机构借入的投资借款，向国外政府、国际金融组织等借入国外借款以及其他投资借款，这种借款是（）。",[145,147,149,151],{"key":20,"text":146,"correct":22},"周转借款",{"key":24,"text":148,"correct":22},"其他借款",{"key":28,"text":150,"correct":26},"基建投资借款",{"key":31,"text":152,"correct":22},"国内储备借款",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":20,"analysis":33},515311,"下列属于财务指标中静态指标的是（）",[157,159,161,163],{"key":20,"text":158,"correct":26},"投资利润率",{"key":24,"text":160,"correct":22},"净现值",{"key":28,"text":162,"correct":22},"内部收益率",{"key":31,"text":164,"correct":22},"动态投资回收期",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":24,"analysis":33},515312,"建设项目后评价的基本方法是（），即把项目建成投产后取得的实际效果、经济效益和社会效益、环境保护等情况与前期工作中的预测情况对比，与项目建设前的情况进行对比，从中发现问题，总结经验和教训。",[169,171,173,175],{"key":20,"text":170,"correct":22},"全面分析法",{"key":24,"text":172,"correct":26},"对比法",{"key":28,"text":174,"correct":22},"重点分析法",{"key":31,"text":176,"correct":22},"分组分析法",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":20,"analysis":33},515313,"招标投标法规定评标方法主要有最低有效报价法和（）.",[181,183,185,187],{"key":20,"text":182,"correct":26},"综合评标法",{"key":24,"text":184,"correct":22},"单价法",{"key":28,"text":186,"correct":22},"实物量法",{"key":31,"text":188,"correct":22},"平均值法",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":20,"analysis":33},515314,"审计署固定资产投资审计司重点审计（）",[193,195,197,199],{"key":20,"text":194,"correct":26},"基础性项目",{"key":24,"text":196,"correct":22},"小型项目",{"key":28,"text":198,"correct":22},"竞争性项目",{"key":31,"text":200,"correct":22},"外资项目",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":28,"analysis":33},515315,"招标人对己方发出的招标文件进行必要的澄清或者修改的，应当在招标文件要求提交招标文件截止时间至少（）日前，以书面形式通知所有招标文件收受人",[205,207,209,211],{"key":20,"text":206,"correct":22},"30",{"key":24,"text":208,"correct":22},"40",{"key":28,"text":210,"correct":26},"15",{"key":31,"text":212,"correct":22},"16",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":24,"analysis":33},515316,"预付的工程款必须在合同中约定抵扣方式，并在（）中进行抵扣。",[217,219,221,223],{"key":20,"text":218,"correct":22},"合同价款",{"key":24,"text":220,"correct":26},"工程进度款",{"key":28,"text":222,"correct":22},"预付备料款",{"key":31,"text":224,"correct":22},"工程结算款",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":28,"analysis":33},515317,"包工包料的预付款应按合同约定拨付，原则上预付比例不低于合同金额的（），不高于合同全额的（）。",[229,231,233,235],{"key":20,"text":230,"correct":22},"10％，20％",{"key":24,"text":232,"correct":22},"20％，30％",{"key":28,"text":234,"correct":26},"10％，30％",{"key":31,"text":236,"correct":22},"15％，25％",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":20,"analysis":33},515318,"项目融资中的BOT方式是建设、经营和（）",[241,243,245,247],{"key":20,"text":242,"correct":26},"移交",{"key":24,"text":244,"correct":22},"改造",{"key":28,"text":246,"correct":22},"管理",{"key":31,"text":248,"correct":22},"创新",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":31,"analysis":33},515319,"按照《招标投标法》规定，不必强制进行公开招标的项目是（）",[253,255,257,259],{"key":20,"text":254,"correct":22},"基础设施",{"key":24,"text":256,"correct":22},"国家融资的项目",{"key":28,"text":258,"correct":22},"外国政府援助资金的项目",{"key":31,"text":260,"correct":26},"国家安全国家秘密项目",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":24,"analysis":33},515320,"生产性经营项目应将流动资金的（）作为铺底流动资金计入建设项目总概算。",[265,267,269,271],{"key":20,"text":266,"correct":22},"20%",{"key":24,"text":268,"correct":26},"30%",{"key":28,"text":270,"correct":22},"40%",{"key":31,"text":272,"correct":22},"50%",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":31,"analysis":33},515321,"（）是职业健康安全和环境管理的基本方针。",[277,279,281,283,285],{"key":20,"text":278,"correct":22},"风险消灭在萌芽状态中",{"key":24,"text":280,"correct":22},"避免事故的发生",{"key":28,"text":282,"correct":22},"分析风险因素",{"key":31,"text":284,"correct":26},"预防为主",{"key":286,"text":287,"correct":22},"E","安全教育",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":28,"analysis":33},515322,"建设项目从正式开工之日起到正式竣工验收之日为止的这一段时间为（）。",[292,294,296,298],{"key":20,"text":293,"correct":22},"竣工验收阶段",{"key":24,"text":295,"correct":22},"设计阶段",{"key":28,"text":297,"correct":26},"在建阶段",{"key":31,"text":299,"correct":22},"开工前准备阶段",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":31,"analysis":33},515323,"合同中没有适用或类似变更工程的价格，则变更部分的价款调整应该（）。",[304,306,308,310],{"key":20,"text":305,"correct":22},"按审价部门提出的价格调整",{"key":24,"text":307,"correct":22},"按发包人指定的价格调整",{"key":28,"text":309,"correct":22},"按设计部门提出的价格调整",{"key":31,"text":311,"correct":26},"由承包人或发包人提出适当的变更价格，经对方确认后调整",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":31,"analysis":33},515324,"招标文件发出到投标文件截止时间至少（）",[316,318,320,322],{"key":20,"text":317,"correct":22},"5日",{"key":24,"text":319,"correct":22},"10日",{"key":28,"text":321,"correct":22},"15日",{"key":31,"text":323,"correct":26},"20日",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":28,"analysis":33},515325,"建设部制订的《建筑工程安全防护、文明施工措施费用及使用管理规定》，投标方安全防护、文明施工措施费的报价，不得低于依据工程所在地工程造价管理机构测定费率计算所需费用总额的（）。",[328,330,332,334],{"key":20,"text":329,"correct":22},"60%",{"key":24,"text":331,"correct":22},"80%",{"key":28,"text":333,"correct":26},"90%",{"key":31,"text":335,"correct":22},"100%",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":24,"analysis":33},515326,"按照建设项目的建设程序，对生产性建设项目生产准备应该在（）进行。",[340,342,344,346],{"key":20,"text":341,"correct":22},"竣工验收以后",{"key":24,"text":343,"correct":26},"竣工验收之前",{"key":28,"text":345,"correct":22},"建设项目后评价之后",{"key":31,"text":347,"correct":22},"交付使用之后",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":24,"analysis":33},515327,"评标委员会由招标人的代表和有关技术，经济等方面的专家组成成员人数为（）人以上单数。",[352,354,356,358],{"key":20,"text":353,"correct":22},"3",{"key":24,"text":355,"correct":26},"5",{"key":28,"text":357,"correct":22},"6",{"key":31,"text":359,"correct":22},"7",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":20,"analysis":33},515328,"开标时间与提交投标文件截止时间（）",[364,366,368,370],{"key":20,"text":365,"correct":26},"相同",{"key":24,"text":367,"correct":22},"不同",{"key":28,"text":369,"correct":22},"都可以",{"key":31,"text":371,"correct":22},"都不对",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":28,"analysis":33},515329,"以下哪个不属于建设准备阶段的工作（）",[376,378,380,382],{"key":20,"text":377,"correct":22},"施工图设计和审查",{"key":24,"text":379,"correct":22},"施工招标",{"key":28,"text":381,"correct":26},"初步设计",{"key":31,"text":383,"correct":22},"办理建设项目施工许可证",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":28,"analysis":33},515330,"在初步设计阶段，影响项目投资的可能性为（）",[388,390,392,394],{"key":20,"text":389,"correct":22},"30%-75%",{"key":24,"text":391,"correct":22},"5%-35%",{"key":28,"text":393,"correct":26},"75%-95%",{"key":31,"text":395,"correct":22},"15%-35%",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":31,"analysis":33},515331,"施工单项合同估算价在（）万元人民币以上的，必须进行招标。",[400,402,404,406],{"key":20,"text":401,"correct":22},"50",{"key":24,"text":403,"correct":22},"100",{"key":28,"text":405,"correct":22},"150",{"key":31,"text":407,"correct":26},"200",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":20,"analysis":33},515332,"由于施工场地狭窄等原因，施工单位在施工期间在场外租赁民房做临时宿舍，则租赁费由（）承担。",[412,413,414,415],{"key":20,"text":39,"correct":26},{"key":24,"text":41,"correct":22},{"key":28,"text":134,"correct":22},{"key":31,"text":416,"correct":22},"建设单位的上级主管部门",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":24,"analysis":33},515333,"投资机会研究的目的在于（）。",[421,423,425,427,429],{"key":20,"text":422,"correct":22},"预测有利的投资机会",{"key":24,"text":424,"correct":26},"发现投资机会",{"key":28,"text":426,"correct":22},"归避投资风险",{"key":31,"text":428,"correct":22},"决策项目",{"key":286,"text":430,"correct":22},"估算成本",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":28,"analysis":33},515334,"由建设单位编制反映全部项目全部实际建设成本的技术经济文件是（）",[435,437,439,441],{"key":20,"text":436,"correct":22},"竣工结算",{"key":24,"text":438,"correct":22},"设计概算",{"key":28,"text":440,"correct":26},"竣工决算",{"key":31,"text":442,"correct":22},"投资估算",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":20,"analysis":33},515335,"（）的设计单位或咨询机构可以在全国范围内承揽大中型项目的可行性研究报告的编制任务。",[447,449,451,453],{"key":20,"text":448,"correct":26},"甲级",{"key":24,"text":450,"correct":22},"乙级",{"key":28,"text":452,"correct":22},"丙级",{"key":31,"text":454,"correct":22},"其他",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":28,"analysis":33},515336,"按照资源合理配置的原则，从国家宏观角度出发，用一套国家参数计算，是以提高建设项目对整个国民经济的浄贡献为目标，评价项目经济合理性，对建设项目的国民经济评价的再评价是（）。 A.建设项目财务效益评审 B.建设项目环境效益评审 C.建设项目国民经济效益评审 D.建设项目社会效益评审",[459,460,461,462,463],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":22},{"key":286,"text":286,"correct":22},{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":24,"analysis":33},515337,"以下选项中（）属于动态指标。",[468,470,472,473],{"key":20,"text":469,"correct":22},"资本金利润率",{"key":24,"text":471,"correct":26},"财务内部收益率",{"key":28,"text":158,"correct":22},{"key":31,"text":474,"correct":22},"利税率",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":31,"analysis":33},515338,"建设部制订的《建设工程质量保证金管理暂行办法》规定，由于发包人原因导致工程无法按规定期限进行竣（交）工验收的，在承包人提交竣（交）工报告（）天后，工程自动进入缺陷责任期。",[479,481,483,485],{"key":20,"text":480,"correct":22},"14天",{"key":24,"text":482,"correct":22},"30天",{"key":28,"text":484,"correct":22},"60天",{"key":31,"text":486,"correct":26},"90天",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":24,"analysis":33},515339,"下列属于2000年1月1日实施的法律为（）",[491,493,495,497],{"key":20,"text":492,"correct":22},"环境保护法",{"key":24,"text":494,"correct":26},"招标投标法",{"key":28,"text":496,"correct":22},"建筑法",{"key":31,"text":498,"correct":22},"城市规划法",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":20,"analysis":33},515340,"建设项目管理中的业主的进度目标指的是（）。",[503,505,507,509,511],{"key":20,"text":504,"correct":26},"项目动用的时间目标",{"key":24,"text":506,"correct":22},"工厂建成可以投入生产",{"key":28,"text":508,"correct":22},"道路建成可以通车",{"key":31,"text":510,"correct":22},"办公楼可以启用",{"key":286,"text":512,"correct":22},"旅馆可以开业",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":20,"analysis":33},515341,"某建设项目的竣工决算交由某审计事务所审计，则建设单位支付给审计事务所的审计费用应计入（）。",[517,519,521,523],{"key":20,"text":518,"correct":26},"建设单位管理费",{"key":24,"text":520,"correct":22},"建筑安装工程费",{"key":28,"text":522,"correct":22},"间接费工",{"key":31,"text":524,"correct":22},"不计入建设项目总投资",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":20,"analysis":33},515342,"以实物数量和货币指标为计量单位，综合反映竣工项目的建设期间、建设成果和财务情况的总结性文件是（），也是竣工验收报告的重要组成部分。",[529,531,533,534],{"key":20,"text":530,"correct":26},"建设项目财务决算",{"key":24,"text":532,"correct":22},"工程决算",{"key":28,"text":440,"correct":22},{"key":31,"text":535,"correct":22},"施工图预算",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":28,"analysis":33},515343,"工程设计管理是建设项目管理中的重要组成内容，也是建设过程中预控管理的（）",[540,542,544,546,548],{"key":20,"text":541,"correct":22},"重要步骤",{"key":24,"text":543,"correct":22},"主要内容",{"key":28,"text":545,"correct":26},"关键环节",{"key":31,"text":547,"correct":22},"中心",{"key":286,"text":549,"correct":22},"首要任务",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":31,"analysis":33},515344,"工程项目竣工投产、生产运营一段时间后，再对项目的立项决策、设计施工、竣工投产、生产运营等全过程进行系统评价的一种经济活动是（）",[554,556,558,560],{"key":20,"text":555,"correct":22},"可行性研究",{"key":24,"text":557,"correct":22},"资产评估",{"key":28,"text":559,"correct":22},"立项",{"key":31,"text":561,"correct":26},"后评估",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":31,"analysis":33},515345,"某土建工程实行按月结算和采用公式法结算预付备料款，施工合同总额为750万元，主要材料金额的比重为60％，预付备料款为20％，当累计结算工程款为（）时，开始扣回备料款。",[566,568,570,572],{"key":20,"text":567,"correct":22},"300万元",{"key":24,"text":569,"correct":22},"450万元",{"key":28,"text":571,"correct":22},"600万元",{"key":31,"text":573,"correct":26},"500万元",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":28,"analysis":33},515346,"（）是我国安全生产的基本方针。",[578,580,582,584,586],{"key":20,"text":579,"correct":22},"以人为本",{"key":24,"text":581,"correct":22},"保障人权",{"key":28,"text":583,"correct":26},"安全第一",{"key":31,"text":585,"correct":22},"重视生命",{"key":286,"text":587,"correct":22},"遵重人格",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":28,"analysis":33},515347,"清单计价工程量编制是以为单位（）",[592,594,595,597],{"key":20,"text":593,"correct":22},"建设项目",{"key":24,"text":88,"correct":22},{"key":28,"text":596,"correct":26},"分部分项工程",{"key":31,"text":598,"correct":22},"建设工程",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":31,"analysis":33},515348,"施工合同文件正确的解释顺序是（）。",[603,605,607,609],{"key":20,"text":604,"correct":22},"施工合同协议书；施工合同专用条款；施工合同通用条款；工程量清单；工程报价单或预算书。",{"key":24,"text":606,"correct":22},"施工合同协议书；中标通知书；施工合同通用条款；施工合同专用条款；工程量清单。",{"key":28,"text":608,"correct":22},"施工合同协议书；中标通知书；施工合同专用条款；施工合同通用条款；工程量清单。",{"key":31,"text":610,"correct":26},"施工合同协议书；中标通知书；投标书及其附件；施工合同专用条款；施工合同通用条款。",{"id":612,"libraryId":5,"type":15,"typeLabel":16,"stem":613,"options":614,"answer":28,"analysis":33},515349,"三峡工程属于（）。",[615,617,619,621],{"key":20,"text":616,"correct":22},"银行贷款项目",{"key":24,"text":618,"correct":22},"企业自筹的建设项目",{"key":28,"text":620,"correct":26},"生产性建设项目",{"key":31,"text":622,"correct":22},"利用外资项目",[624,628,632,635,638,642],{"id":625,"name":626,"category":7,"favorite":627},256,"综合应用能力",6,{"id":629,"name":630,"category":7,"favorite":631},194,"《公安》基础知识+专业",5,{"id":633,"name":634,"category":7,"favorite":631},195,"政法干警",{"id":636,"name":637,"category":7,"favorite":631},255,"职业能力倾向测验",{"id":639,"name":640,"category":7,"favorite":641},212,"国家公务员-行政能力测试",4,{"id":643,"name":644,"category":7,"favorite":641},254,"公共基础知识"]