[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-516253":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},516253,230,2,"多选题","在建设工程工程量清单的各个组成部分中，投标人不得随意更改或调整（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","分部分项工程量清单",true,{"key":16,"text":17,"correct":18},"B","措施项目清单",false,{"key":20,"text":21,"correct":14},"C","其他项目清单中的招标人部分",{"key":23,"text":24,"correct":14},"D","其他项目清单中招标人填写的零星工作项目和数量","ACD","",{"id":6,"name":28,"category":29,"favorite":30},"审计学 (军队文职)","公务员",0]