[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-516246":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},516246,230,2,"多选题","下列关于工程量清单计价办法的说法正确的有（）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","此方法是一种独立的计价模式",true,{"key":16,"text":17,"correct":14},"B","此方法是一种市场定价模式",{"key":19,"text":20,"correct":21},"C","此方法采用全费用单价",false,{"key":23,"text":24,"correct":14},"D","此方法包括编制招标标底、投标报价、合同价款的确定与调整和办理工程结算",{"key":26,"text":27,"correct":21},"E","有利于国家对建设工程造价的宏观调控","ABD","",{"id":6,"name":31,"category":32,"favorite":33},"审计学 (军队文职)","公务员",0]