[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-516240":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},516240,230,2,"多选题","目前，我国建设项目的建设程序包括（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","开工前期准备阶段",true,{"key":16,"text":17,"correct":18},"B","报建阶段",false,{"key":20,"text":21,"correct":18},"C","设计阶段",{"key":23,"text":24,"correct":14},"D","在建阶段",{"key":26,"text":27,"correct":14},"E","竣工验收阶段","ADE","",{"id":6,"name":31,"category":32,"favorite":33},"审计学 (军队文职)","公务员",0]