[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-515502":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},515502,230,2,"多选题","甲公司与乙公司签订一项承揽合同，双方约定由乙公司为甲公司加工400套塑钢窗，甲公司提供图纸；乙公司提供材料，甲公司派2名技术人员协助乙公司进行加工；期限3个月。合同签订后，甲公司的技术人员一直未到位，乙公司发生误工损失3万元，则根据合同法律制度的规定，乙公司有权采取的措施有()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","催告甲公司在合理期限内履行义务",true,{"key":16,"text":17,"correct":14},"B","要求顺延履行期限",{"key":19,"text":20,"correct":21},"C","直接解除该承揽合同",false,{"key":23,"text":24,"correct":14},"D","要求甲公司赔偿因此所受的损失","ABD","(1)选项ABC：承揽工作需要定作人协助的，定作人有协助的义务。定作人不履行协助义务致使承揽工作不能完成的，承揽人可以催告定作人在合理期限内履行义务，并可以顺延履行期限；定作人逾期不履行的，承揽人可以解除合同。(2)选项D：因定作人的违约行为给承揽人造成损失的，承揽人有权要求定作人赔偿损失。",{"id":6,"name":28,"category":29,"favorite":30},"审计学 (军队文职)","公务员",0]