[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-515372":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":28},515372,230,1,"单选题","实施阶段投资控制的目标，一般是以（）确定的合同价作为投资控制目标。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","招投标阶段",true,{"key":16,"text":17,"correct":18},"B","施工阶段",false,{"key":20,"text":21,"correct":18},"C","验收阶段",{"key":23,"text":24,"correct":18},"D","竣工阶段",{"key":26,"text":27,"correct":18},"E","交付使用阶段","",{"id":6,"name":30,"category":31,"favorite":32},"审计学 (军队文职)","公务员",0]