[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-515350":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},515350,230,1,"单选题","在正常合理的施工条件下，规定完成一定计量单位的分项工程或结构构件所必须的人工、材料和施工机械台班以及价值货币所表现的消耗数量标准是（）",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","概算定额",false,{"key":16,"text":17,"correct":14},"B","投资估算",{"key":19,"text":20,"correct":21},"C","预算定额",true,{"key":23,"text":24,"correct":14},"D","安装定额","",{"id":6,"name":27,"category":28,"favorite":29},"审计学 (军队文职)","公务员",0]