[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-515348":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},515348,230,1,"单选题","施工合同文件正确的解释顺序是（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","施工合同协议书；施工合同专用条款；施工合同通用条款；工程量清单；工程报价单或预算书。",false,{"key":16,"text":17,"correct":14},"B","施工合同协议书；中标通知书；施工合同通用条款；施工合同专用条款；工程量清单。",{"key":19,"text":20,"correct":14},"C","施工合同协议书；中标通知书；施工合同专用条款；施工合同通用条款；工程量清单。",{"key":22,"text":23,"correct":24},"D","施工合同协议书；中标通知书；投标书及其附件；施工合同专用条款；施工合同通用条款。",true,"",{"id":6,"name":27,"category":28,"favorite":29},"审计学 (军队文职)","公务员",0]