[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-515326":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},515326,230,1,"单选题","按照建设项目的建设程序，对生产性建设项目生产准备应该在（）进行。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","竣工验收以后",false,{"key":16,"text":17,"correct":18},"B","竣工验收之前",true,{"key":20,"text":21,"correct":14},"C","建设项目后评价之后",{"key":23,"text":24,"correct":14},"D","交付使用之后","",{"id":6,"name":27,"category":28,"favorite":29},"审计学 (军队文职)","公务员",0]