[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-515322":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},515322,230,1,"单选题","建设项目从正式开工之日起到正式竣工验收之日为止的这一段时间为（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","竣工验收阶段",false,{"key":16,"text":17,"correct":14},"B","设计阶段",{"key":19,"text":20,"correct":21},"C","在建阶段",true,{"key":23,"text":24,"correct":14},"D","开工前准备阶段","",{"id":6,"name":27,"category":28,"favorite":29},"审计学 (军队文职)","公务员",0]