[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-515302":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},515302,230,1,"单选题","在基础施工中发现地下障碍物，需对原工程设计进行变更，变更导致合同价款的增减及造成的承包商损失应由（）承担。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","建设单位",true,{"key":16,"text":17,"correct":18},"B","建设单位与承包商共担",false,{"key":20,"text":21,"correct":18},"C","承包商",{"key":23,"text":24,"correct":18},"D","勘察设计单位","",{"id":6,"name":27,"category":28,"favorite":29},"审计学 (军队文职)","公务员",0]