[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-515257":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},515257,230,1,"单选题","我国目前建设工程施工招标标底的编制，主要采用（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","单位估价法和实物量法",false,{"key":16,"text":17,"correct":18},"B","定额计价和工程量清单计价",true,{"key":20,"text":21,"correct":14},"C","预算定额法和投标平均法",{"key":23,"text":24,"correct":14},"D","单位估价法和综合单价法","",{"id":6,"name":27,"category":28,"favorite":29},"审计学 (军队文职)","公务员",0]