[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-561562":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},561562,23,3,"判断题","海洋工程建设项目的单位,必须在建设项目可行性研究阶段,对海洋环境进行科学调查,根据自然条件和社会条件,合理选址,编报环境影响报告书。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"",{"id":6,"name":21,"category":22,"favorite":23},"海洋石油天然气开采","安全生产",0]