[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-502407":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},502407,223,2,"多选题","下列关于互斥项目选优决策的表述中，错误的有()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","如果两个互斥项目的期限相同，但原始投资额不同，应选择内含报酬率较高的项目",true,{"key":16,"text":17,"correct":14},"B","如果两个互斥项目的期限不同，但原始投资额相同，应选择净现值较大的项目",{"key":19,"text":20,"correct":14},"C","期限相同但原始投资额不同的互斥项目，不能直接由年金净流量决定项目取舍",{"key":22,"text":23,"correct":24},"D","期限不同的互斥项目，不能直接由净现值决定项目的取舍",false,"ABC","在互斥投资方案的选优决策中，决策结论不受原始投资额的大小的影响。互斥项目期限相同时，应选择净现值最大的项目；互斥项目的期限不同时，应选择年金净流量最大的项目。所以选项ABC的表述错误。",{"id":6,"name":28,"category":29,"favorite":30},"会计学 (军队文职)","公务员",0]