[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-501501":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},501501,223,1,"单选题","在直接人工预算中，单位产品人工工时和每小时人工成本数据来自于()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","制造费用预算",false,{"key":16,"text":17,"correct":14},"B","生产预算",{"key":19,"text":20,"correct":21},"C","标准成本资料",true,{"key":23,"text":24,"correct":14},"D","销售预算","在直接人工预算中，单位产品人工工时和每小时人工成本数据来自于标准成本资料。",{"id":6,"name":27,"category":28,"favorite":29},"会计学 (军队文职)","公务员",0]