[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-501253":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},501253,223,1,"单选题","下列投资项目评价指标中，不受建设期长短、投资回收时间先后及现金流量大小影响的评价指标是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","净现值率",false,{"key":16,"text":17,"correct":18},"B","投资利润率",true,{"key":20,"text":21,"correct":14},"C","内含报酬率",{"key":23,"text":24,"correct":14},"D","投资回收期","投资利润率仅受年平均利润率和投资总额的影响；净现值率和内含报酬率受现金流量影响；投资回收期指标受建设期的影响。",{"id":6,"name":27,"category":28,"favorite":29},"会计学 (军队文职)","公务员",0]